ArmaBidSolutions
Our Case Studies

Our Recently Finalized Cost Estimates

Explore a gallery of our completed material takeoffs and independent project cost audits across North America. Search by keywords or filter by sector.

Project Log

Completed Pre-Construction Audits

From regional luxury duplex framing lists to high-tonnage structural steel layouts, our numbers stand up to the most demanding contract negotiations.

Commercial Project2025

Arma High-Rise Commercial Tower

Detailed pre-construction bid estimation and material takeoffs for a 24-story commercial office building. The project required complete concrete foundation volumetric pricing, post-tensioned slab measurements, and full structural steel framing tonnage reports.

Estimated Scope Highlight

  • 22,000 Cubic Yards of Ready-Mix Concrete
  • 1,800 Tons of Structural Steel framing members
  • + 3 more scope items completed
Chicago, IL$42,500,000 Value
Healthcare Project2025

Metro Health Ambulatory Surgery Center

A comprehensive quantity takeoff and cost consultation for a state-of-the-art ambulatory surgery center with 6 operating rooms and cleanroom-standard HVAC systems.

Estimated Scope Highlight

  • Infection Control Risk Assessment (ICRA) containment partitions takeoff
  • Medical Gas distribution lines (oxygen, vacuum, nitrous oxide) piping measurements
  • + 3 more scope items completed
Houston, TX$18,200,000 Value
Residential Project2024

Oakwood Residential Subdivision

Framing packages, civil sitework, and structural wood takeoffs for a 45-home luxury residential development. We delivered highly itemized lumber yard shipping lists, minimizing waste.

Estimated Scope Highlight

  • Civil 3D grading excavation balance (cut and fill modeling of 35,000 CY of earth)
  • Detailed framing package (studs, plates, joists, engineered LVL headers)
  • + 3 more scope items completed
Atlanta, GA$9,800,000 Value
Warehouse Project2025

Global Logistics Mega-Warehouse

Detailed budget and takeoff modeling for a 500,000 SF distribution logistics center. Key elements included heavy concrete tilt-up wall panels and high flatness (FF/FL) slab-on-grade specifications.

Estimated Scope Highlight

  • Laser-guided concrete slab-on-grade volume (8-inch thickness with structural mesh)
  • Tilt-up concrete perimeter panels design, rigging, and placement metrics
  • + 3 more scope items completed
Inland Empire, CA$31,400,000 Value
Education Project2024

Beacon Hill University Science Wing

Mechanical, electrical, plumbing, and low-voltage electrical engineering and estimating support for a complex university biology and chemistry lab expansion.

Estimated Scope Highlight

  • Branch wiring, conduit, cable tray, and junction box takeoffs for 80 lab benches
  • Acid-waste drainage piping (high-density PVDF lines) and neutralizer tanks
  • + 3 more scope items completed
Boston, MA$22,100,000 Value
Hospitality Project2026

The Grand Regal Luxury Resort

Complete interior finishes material takeoffs and bid proposals for a high-end beachside boutique resort lobby and 120 guest suites.

Estimated Scope Highlight

  • Porcelain and marble tile layouts (mosaics, custom floor medallion sizes)
  • Acoustical ceiling tile grids, custom wood panel linear drops, and sound baffles
  • + 3 more scope items completed
Miami, FL$14,500,000 Value
Arma Bid Solutions Verification Plans
How We Verify

Behind the Quantities: The Double-Check QA Audit

We never guess or rely on broad programmatic square-foot averages. In our portfolio logs, each project represents a rigorous takeoff procedure. Our specialist engineers use Bluebeam Revu to trace and measure distinct drawings, creating digital 2D color markup maps that are shared with clients for rapid visual validation.

Furthermore, before final files are exported to Excel or your specific estimating templates, a certified Senior Estimator reviews the overall draft scope, reconciling line items against localized historical cost books to ensure pricing compliance.

Need to Audit an Existing Contractor Proposal?

We provide independent, third-party cost validation and change-order auditing to protect development budgets against inflation gaps.

Speak With Cost Advisors